Energy

Construction of complex integrated projects with the Turn-Key method.
Engineering, supply, construction, installation and commissioning of Turn-Key projects and EM equipment.

Project category: Energy – All category here

Wet Sludge Conveyors at Units IV and V SES Megalopolis

Wet Sludge Conveyors at Units IV and V SES Megalopolis

Plus SignPlus Link
On-Line lignite analyzer System at Kardia SES

On-Line lignite analyzer System at Kardia SES

Plus SignPlus Link
Lignite Transportation System update at Units III, SES Megalopolis A

Lignite Transportation System update at Units III, SES Megalopolis A

Plus SignPlus Link
Erection and Assembly Works for the conversion to Biomass of AVV 1, Avedoere SES, Denmark

Erection and Assembly Works for the conversion to Biomass of AVV 1, Avedoere SES, Denmark

Plus SignPlus Link
BOP Piping Erection, AVV Ι, Avedoere, Denmark

BOP Piping Erection, AVV Ι, Avedoere, Denmark

Plus SignPlus Link
Replacement of Collectors and steam Pipes of superheated and heated/reheated steam, at Unit II, SES Ag. Dimitrios

Replacement of Collectors and steam Pipes of superheated and heated/reheated steam, at Unit II, SES Ag. Dimitrios

Plus SignPlus Link
Medium Voltage upgrade for Ikaria power plant

Medium Voltage upgrade for Ikaria power plant

Plus SignPlus Link
Boiler upgrade for ΝΟx emissions reduction of Unit V SES Ag. Dimitrios

Boiler upgrade for ΝΟx emissions reduction of Unit V SES Ag. Dimitrios

Plus SignPlus Link
Biomass Feeding System for Studstrup biomass plant, Denmark

Biomass Feeding System for Studstrup biomass plant, Denmark

Plus SignPlus Link
Hydrocyclones - Desulfurization System of Unit IV Megalopolis B'

Hydrocyclones - Desulfurization System of Unit IV Megalopolis B'

Plus SignPlus Link
FGD Pipe Restoration in the Cooling Tower of Melitis SES

FGD Pipe Restoration in the Cooling Tower of Melitis SES

Plus SignPlus Link
Lignite Sampling System for Aminteon, Ag. Dimitrios, Ptolemais and Megalopolis SES

Lignite Sampling System for Aminteon, Ag. Dimitrios, Ptolemais and Megalopolis SES

Plus SignPlus Link
Manufacturing of the Submerged Scraper Conveyor

Manufacturing of the Submerged Scraper Conveyor

Plus SignPlus Link
Erection of piping at Unit V – 811MW – SES Megalopolis

Erection of piping at Unit V – 811MW – SES Megalopolis

Plus SignPlus Link
Upgrade - Refurbishment of the lignite mills of Unit IV SES Megalopolis B'

Upgrade - Refurbishment of the lignite mills of Unit IV SES Megalopolis B'

Plus SignPlus Link
Erection of steam turbines, generators at Unit V – 811MW – SES Megalopolis

Erection of steam turbines, generators at Unit V – 811MW – SES Megalopolis

Plus SignPlus Link
Repair of high pressure boilers at thermal power plants of Northern Greece

Repair of high pressure boilers at thermal power plants of Northern Greece

Plus SignPlus Link
Repair of high pressure boilers at thermal power plants of Southern Greece

Repair of high pressure boilers at thermal power plants of Southern Greece

Plus SignPlus Link
Fire Protection System at Samos TPS

Fire Protection System at Samos TPS

Plus SignPlus Link
Three generating sets 18MW at Mykonos TPS

Three generating sets 18MW at Mykonos TPS

Plus SignPlus Link
37 Generating Sets 49MW

37 Generating Sets 49MW

Plus SignPlus Link
Generating Sets at various Greek Islands

Generating Sets at various Greek Islands

Plus SignPlus Link
Lime Stone Milling Upgrade, Megalopolis SES

Lime Stone Milling Upgrade, Megalopolis SES

Plus SignPlus Link
Ash Conveyors Megalopolis A’ SES

Ash Conveyors Megalopolis A’ SES

Plus SignPlus Link