Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery
Project Gallery

The Workshop

Steel Construction Plant

SOLERGON S.A. is operating at a proprietary area of ​​28.000 m² a steel construction plant of 2.000m² at the 3rd km Filotas – Antigono in the prefecture of Florina.

The factory serves the construction needs of the company’s projects while is active in manufacruring of high pressure, production of steel structures and piping and in the field of repairing metal parts for third parties.

The factory is properly equipped to perform fabrication and erection of steel structures and piping. The equipment:

  • 2 Gantry Cranes 10tn
  • Pressing Brake Machine G HD 4330, BOSCHERT
  • Shear G-CUT NC 3013, BOSCHERT
  • Belt saw machine SPECIAL 650 DI, MACC
  • Bending machine DB20765T, Transfluid
  • Pipe Cutting and Beveling Machines, ORBITALUM and GBC
  • Heat treatment equipment (inductive and resistance furnace 42KW and 82KW, WELDOTHERM
  • Plasma cutting machines, HYPERTHERM
  • Sandblasting machine – 200lit, Dynamiki
  • Coating machine, Clemco-Graco
  • Welding machines MIG and TIG, 220Volt and 380Volt

All welders employed at the factory are certified according to EN 287-1.

Metal Construction - Click to see all the projects

Design and Manufacturing of a 5000m3 diesel tank for Rodos SES

Design and Manufacturing of a 5000m3 diesel tank for Rodos SES

Plus SignPlus Link
Manufacturing of high pressure parts

Manufacturing of high pressure parts

Plus SignPlus Link
Submerged Scraper Conveyor Unit IV Megalopolis

Submerged Scraper Conveyor Unit IV Megalopolis

Plus SignPlus Link
Upgrade of the Lignite Mills of Unit IV, Megalopolis B”

Upgrade of the Lignite Mills of Unit IV, Megalopolis B”

Plus SignPlus Link