Description
Erection of 2 x GE 9FB Gas Turbines, 2 x GE 330H Generators, electrical and mechanical erection of all GTs and Generators Auxiliary equipment and piping systems.
Anchors installation, GTs on Base ‐ Alignment, Air Inlet Ducts – Exhaust Ducts, Connection – Alignment to Boiler Duct, GTs Piping (Air/Lube Oil/Fuel), Sound‐proof Compartment & Fans, Skids Installation (LO, Fuel, Air) and Piping connections to GTs, BoP Piping Systems (Cooling Water, Fuel, H2/CO2, Lube Oil) Electrical / I&C Installation, Lube Oil Flushing, Piping Systems cleaning and Pressure Tests.